1、 Basic information
Enterprise name:* |
Hebei Sitong New Metal Materials Co., Ltd |
Organization code or unified social credit code:* |
911306007183686135 |
Name of Legal Representative:* |
Zang Liguo |
Postal Code:* |
071100 |
Industry: |
Non ferrous metal extension processing |
Address:* |
No. 359, Fazhan West Street, Qingyuan District, Baoding City |
contact number:* |
0312-5806018 |
Main products:* |
Aluminum base master alloy, grain refiner, metal additive, special alloy, etc |
Scale:* |
Enterprises above designated size |
2、 Pollutant discharge information
1. Main pollutants: particulate matter, sulfur dioxide, nitrogen oxides
2. Characteristic pollutant: fluoride
3. Emission mode: organized emission
4. Number and distribution of outlets: There are 14 outlets in total, which are distributed in the plant area.
5. Actual emission concentration in the third quarter: particulate matter 1.6mg/m3(standard 120 mg/m3), sulfur dioxide 6.22 mg/m3(standard 200 mg/m3), nitrogen oxides 0.57 mg/m3(standard 300 mg/m3). No exceeding standard.
6. Total approved emissions:
Particulate matter 5.401t/a, sulfur dioxide 7.095 t/a, nitrogen oxide 18.98 t/a
Fluoride 0.317 t/a
3、 Construction and operation of pollution prevention facilities (there is no production wastewater, but only domestic wastewater)
48 gas collecting hoods (98% gas collecting rate), 2 dust removal towers (20% dust removal rate), 7 sets of water film dust collectors (90% dust removal rate, 30% denitration rate, 90% fluoride removal rate), 26 filter cartridge dust collectors (98% dust removal rate), 6 bag dust collectors (99% dust removal rate), 2 sets of denitration equipment (90% denitration rate), 1 set of oil fume purifier (75% removal rate), 15 dust chambers, mobile dust collectors, etc.
4、 Environmental impact assessment of construction projects and other environmental protection administrative licensing
62000t/a functional alloy material project: In September 2013, the Environmental Impact Report on the 62000t/a Functional Alloy Material Project of Hebei Sitong New Metal Materials Co., Ltd. was prepared and completed. On November 25, 2013, the approval opinions of Baoding Municipal Environmental Protection Bureau (BHS [2013] No. 48) were obtained, On November 24, 2015, it passed the approval of Baoding Environmental Protection Bureau for the phased completion of environmental protection acceptance (BHY [2015] No. 80); In March 2016, the enterprise prepared and completed the Supplementary Report on Environmental Impact of Hebei Sitong New Metal Materials Co., Ltd.'s 62000 ton/year Functional Alloy Materials Project, and passed the completion environmental protection acceptance of the Qingyuan District Environmental Protection Bureau of Baoding City on December 28, 2016 (BHY [2016] No. 29).
The project with an annual output of 20000 tons of metal element additives and 2000 tons of special intermediate alloys (expanded in the new plant): the total investment of the expansion project is 109.0323 million yuan, of which the environmental protection investment is 2.47 million yuan, accounting for 2.265% of the total investment. In June 2017, the Environmental Impact Report of the Project with an Annual Output of 20000 Tons of Metal Element Additives and 2000 Tons of Special Intermediate Alloys was prepared, and the EIA approval opinions of Qingyuan District Environmental Protection Bureau of Baoding City (QHS [2017] No. 004) were obtained on July 13, 2017; The independent completion acceptance will be carried out on April 21, 2018.
Reconstruction and expansion project of new functional alloy materials: the expansion project is carried out in the original No. 3 Workshop and is constructed in three phases. The total investment of the project is 91.456 million yuan, including 1.8 million yuan of environmental protection investment, accounting for 1.97% of the total investment. On January 5, 2018, obtained the EIA approval opinions of Qingyuan District Branch of Baoding Municipal Environmental Protection Bureau (QHS [2018] No. 001); On April 18, 2018, we obtained the approval opinions of Qingyuan District Branch of Baoding Municipal Environmental Protection Bureau on environmental assessment changes; On November 23, 2018, the second change approval opinion of the environmental assessment of Qingyuan District Branch of Baoding Municipal Environmental Protection Bureau was obtained; On June 20, 2019, carry out independent acceptance of the completed project phase I.
Self owned emergency LNG gasification station project: a new project is to be built on the land reserved in the company's plant area. The total investment of the project is 4.11 million yuan, including 100000 yuan for environmental protection, accounting for 2.43% of the total investment. On July 30, 2018, obtained the EIA approval opinions of Qingyuan District Branch of Baoding Municipal Environmental Protection Bureau (QHS [2018] No. 094); The project has been completed and accepted in September 2020.
The new functional alloy material project with an annual output of 25000 tons: the expansion project will be constructed on the land reserved in the company's factory area in two phases. The total investment of the project is 200157800 yuan, including 4.31 million yuan for environmental protection, accounting for 2.15% of the total investment. On November 28, 2018, obtained the EIA approval opinions of Qingyuan District Branch of Baoding Municipal Environmental Protection Bureau (QHS [2018] No. 009); At present, Phase I construction is under way.
Obtain the national pollution discharge license on August 6, 2020, with the number of 911306007183686135001V.
5、 Emergency Plan for Environmental Emergencies
The Emergency Plan for Environmental Emergencies is prepared, and drills are conducted once a year;
The Emergency Plan for Heavily Polluted Weather has been prepared and implemented in strict accordance with the plan.
6、 Other environmental information that should be disclosed
Self inspection shall be carried out according to the requirements of the pollution discharge permit;
There are self inspection plans and monthly, quarterly and annual inspection reports.
November 13, 2020